These seven projects are proposed for Commissioner District 1. Which do you think will most benefit our community? At the Choose Projects table, you will select three District 1 projects for possible inclusion in the MSTIP '23-'28 funding cycle.

To learn about the projects, use this interactive map or the table at the bottom of the page. 

Can’t see the project details on the map? Refresh your browser. Click on the project name if details do not appear.

All road projects go through a multistep process of Preliminary Design, Final Design and Construction including robust community engagement.

  • Preliminary Design includes environmental assessment, decisions on the number of lanes and type of bicycle and pedestrian facilities and a construction cost estimate. Projects proposed for Preliminary Design Only will be positioned for future Final Design and Construction funding opportunities.
     
  • Final Design includes the engineering, land use and environmental permits and right-of-way purchases needed to make a project construction ready.
     
  • Construction is when the project gets built.
     
  • Match funding brings more state and federal money for projects by using MSTIP dollars to pay for some of the project costs.

 

Project

Location

Proposed For

Description

Photo (click or tap to enlarge)

Alexander Street

178th Avenue to 192nd Avenue

Final Design and Construction

New sidewalks, pedestrian crossings, bike lanes, streetlighting and center turn lane (as needed) to support the Aloha Town Center street design. Preliminary Design already funded.

170th Avenue

Alexander Street to Merlo Road

Final Design and Construction

New sidewalks, pedestrian crossings, bike lanes, streetlighting, and center turn lane (as needed). Provides access to nature park and extension of Beaverton Creek Trail. Preliminary Design already funded.

185th Avenue

Farmington Road to Kinnaman Road

Preliminary Design Only

Design for new sidewalks, pedestrian crossings, bike lanes, streetlighting and center turn lane (as needed).

205th Avenue Bridge

Over Beaverton Creek

Final Design and Construction

Replace the old bridge. Add streetlights from Baseline Street to Quatama Road, bike lanes and sidewalks. Preliminary Design already funded.

Farmington Road

173rd Avenue to 209th Avenue

Match

Matching funds for potential federal/state grant for design and construction of new sidewalks, bike lanes, turn lanes (as needed), pedestrian crossings, streetlighting and possible intersection realignments.

Allen Boulevard

Murray Boulevard to King Boulevard

Preliminary Design Only

Design for new sidewalks, pedestrian crossings, bike lanes, streetlighting and center turn lane (as needed).

Beaverton Downtown Loop Phase 1 Watson Avenue

Millikan Way to First Street

Preliminary Design, Final Design and Construction

Wider sidewalks and new bike lanes, bus stops and intersection improvements.