These six projects are proposed for Commissioner District 4. Which do you think will most benefit our community? At the Choose Projects table, you will select three District 4 projects for possible inclusion in the final MSTIP '23-'28 funding cycle.

To learn about the projects, use this interactive map or the table at the bottom of the page. 

Can’t see the project details on the map? Refresh your browser. Click on the project name if details do not appear.

All road projects go through a multistep process of Preliminary Design, Final Design and Construction including robust community engagement.

  • Preliminary Design includes environmental assessment, decisions on the number of lanes and type of bicycle and pedestrian facilities and a construction cost estimate. Projects proposed for Preliminary Design Only will be positioned for future Final Design and Construction funding opportunities.
     
  • Final Design includes the engineering, land use and environmental permits and right-of-way purchases needed to make a project construction ready.
     
  • Construction is when the project gets built.
     
  • Match funding brings more state and federal money for projects by using MSTIP dollars to pay for some of the project costs.

 

 

Project

Location

Proposed For

Description

Photo (click or tap to enlarge)

Wren Road / Susbauer Road

Intersection

Preliminary Design, Final Design and Construction

Intersection realignment; possible roundabout or traffic signal.

OR 47 at SW Fern Hill Road-Maple Street

Intersection

Final Design and Construction

Safety improvements. Collaboration with Washington County, City of Forest Grove and Oregon Department of Transportation. Preliminary Design already funded.

Glencoe Road / West Union Road Roundabout

Intersection

Preliminary Design, Final Design and Construction

New roundabout to support downtown and developing areas. Connection to new West Union Pedestrian Path.

N 19th Avenue

Baseline Street to Council Creek

Preliminary Design, Final Design and Construction

New sidewalks, pedestrian crossings, bike lanes, streetlighting and center turn lane (as needed). Includes roundabout at Holladay Street.

S 29th Boulevard Phase 3: Baseline Street / 345th Avenue

Intersection

Preliminary Design, Final Design and Construction

Traffic signal installation at 345th Avenue and Baseline Street intersection. Completion of multiuse path between S 29th Boulevard and 345th Avenue. Gates at railroad crossing on 345th Avenue.

Cornell Road / Brookwood Parkway

Intersection

Preliminary Design, Final Design and Construction

New turn lanes and/or through travel lanes and bike and pedestrian crossings.